Skip to content
Search
Cart 0

Cancel or Change an Order

Last updated:

You ticked the Song Sparrow, then remembered the one at the feeder this morning was a House Finch. Or you typed your yard’s name with a letter missing. Or you simply changed your mind. This page explains how to cancel a Bird Ink order or change it, how long you have to ask, what can still be altered and how quickly a cancelled order is refunded. The short version: write to us within 24 hours of placing the order.

Cancellations and changes at a glance

  • Window: within 24 hours of placing your order.
  • How to ask: email support@birdink.shop with your order number and exactly what you want.
  • What can change: size, colour, mug size, ticked birds, yard name, start year, the free line, the pieces in the order and the shipping address.
  • Refunds for cancelled orders: the full amount you paid, refunded within 7 days of our confirming the cancellation.
  • After 24 hours: the order goes ahead as placed, and any piece can still be returned within 60 days of delivery with a free return label.
  • No proof: we print exactly what was ticked and typed, so these 24 hours are your chance to adjust.

1. Why the window is 24 hours

Every Bird Ink piece is printed to order, or, for the three hats, embroidered to order. Nothing is pulled from a shelf. Once you check out, your order heads into its 1–3 business days of making, and the yard list you ticked becomes ink on fabric or ceramic. The 24-hour window gives you a clear, fair period to look again at what you ordered while there is still room to alter it.

The window is counted from the moment the order is placed, the time shown in your order confirmation email. An order placed at 8:15 on a Saturday morning can be cancelled or changed until 8:15 on Sunday morning, weekend or not. The same 24 hours apply to every product, whether it carries your own yard list or a single Cedar Waxwing with nothing to type.

2. How to cancel or change an order

  1. Write to support@birdink.shop, ideally from the email address you used at checkout.
  2. Use a subject line that says what you need: “Cancel order” or “Change order”, followed by the order number.
  3. In the message, set out the exact change. “Please add Carolina Wren to my list” is clear. “Can you fix the birds?” leaves us guessing.
  4. For a personalised piece, spell out any new text letter by letter: the yard name, the start year or the free line.
  5. We confirm by email, within 24 hours on business days. Your change or cancellation is settled once that confirmation reaches you.

The request needs to reach us inside the 24 hours. Our confirmation can follow afterwards. If you send your email at hour 23, you are within the window, even if our reply comes the next business day.

Support is by email only. There is no phone line, so the quickest route is always a clear email with the order number at the top.

3. What can be changed, and when

Changes to a Bird Ink order
What you want to change Within 24 hours of ordering After 24 hours
Cancel the whole order Yes, refunded in full within 7 days of our confirmation Return within 60 days of delivery, free label
Size or colour of apparel Yes Return within 60 days, then order the new size or colour
Mug size, 11 oz or 15 oz Yes Return within 60 days, then order again
Ticked birds on a yard list Yes Prints as originally ticked; returnable within 60 days
Yard name, start year or free line Yes Prints as originally typed; returnable within 60 days
Add or remove a piece Yes Place a new order, or return an unwanted piece
Shipping address Yes Email us and we will tell you what can be done

4. Changing the personal details on a piece

Personalised orders are where this window matters most. Because nothing is emailed for approval before printing, the order you placed is the order we print. A few common cases, and how they go:

4.1 A typo in the yard name

You order a Yard List Hoodie for “The Maple Stret Yard, since 2019” and catch the missing letter an hour later while rereading the confirmation. Email us straight away with the order number and the corrected name, written out in full: The Maple Street Yard. Because you are inside 24 hours, we can change it with you, and the hoodie will print with the right spelling.

4.2 A bird forgotten, or one too many

Lists are rarely finished the moment you check out. The Cedar Waxwings you only see in February come to mind as you fall asleep. Within 24 hours, you can add a bird from the index or take one away, as long as the list stays within the limit for that piece. The limits are: up to 18 birds on the Yard List Crewneck Sweatshirt, 16 on the Yard List Hoodie, 14 on the Yard List Tee, 20 on the Yard List Tote Bag and 10 on the Yard List Mug.

4.3 A list that outgrew its piece

Say your tee is at its limit of 14 and you want to add a fifteenth bird. The tee cannot hold it, but the crewneck can hold 18 and the tote 20. Within 24 hours, you can cancel the tee and order the crewneck or tote instead, or ask us to help you with the switch. The price is different, so section 6 explains how that works.

4.4 Unsure which bird it really was

A gift buyer who is not a birder might order a Spark Bird Tee with Black-capped Chickadee, then hear from a sibling that Mum’s chickadee is the Carolina one. Both are in the index. Email us inside the window and we will change the species. If you are still unsure, tell us roughly where the recipient lives, and we will help you think it through before the order goes ahead.

4.5 The free line

The free line prints exactly as you type it, including capitals, hyphens, apostrophes and spaces. If you typed “tui” and would rather it read “Tui”, or you want to replace it altogether with a different bird, write it out precisely in your email within 24 hours. Birders in Australia and New Zealand use this line for their own local birds, since the index covers North American yard and feeder birds only.

5. Changing the shipping address

If the address on your order is wrong, or the gift should go to a different house, email us within 24 hours with the complete corrected address: name, street and number, apartment or unit, town or city, state or province, ZIP or postal code and country. We ship only to the United States, Canada, Australia and New Zealand, so a new address must be in one of those four countries.

After 24 hours, or once a parcel has left, the address on the order cannot be edited from our side. Write to us anyway with your order number. Contact us and we will tell you honestly what can still be done, without promising a redirect we cannot arrange.

6. When a change moves the price

Some changes alter what the piece costs. A 2XL or 3XL adds $2, a 4XL or 5XL adds $4, and a 15 oz mug costs $3 more than the 11 oz. Switching from a tee to a crewneck moves the price too. Shipping stays free whatever you change.

When a change would move the price, we tell you the difference before anything is altered, and we agree with you how to handle it. Often the simplest route is to cancel the first order, which is refunded in full within 7 days of our confirmation, and place a new order at the right price. If you would like us to walk you through it, just ask.

7. Duplicate orders, several changes and gift orders

7.1 An order placed twice

It happens more than you might think: a slow page, a second press of the button, and two identical Window Seat Mugs are on their way. If you see two confirmation emails for one intended purchase, write to us within 24 hours of the second order with both order numbers and tell us which one to cancel. The cancelled order is refunded in full within 7 days of our confirmation.

7.2 Several changes in one order

If you need to adjust more than one thing, put every change in a single email rather than a string of short ones. For example: change the hoodie from Navy to Forest Green, add Northern Flicker to the list, and correct the start year from 2016 to 2019. One complete message is far easier to get exactly right than three partial ones, and it means our confirmation covers everything at once.

7.3 Changes to a gift

If you are buying for someone else, you are the one who contacts us about the order. Please write from the email address used at checkout, so we can match the request to the order quickly and be sure it comes from the person who placed it. If the recipient spots something in the gift plan, such as the wrong colour or a bird that has never actually visited their yard, they can tell you, and you can pass it on to us within the 24 hours. A quiet word from a sister who knows the feeder well has saved more than one Yard List Mug from listing an Evening Grosbeak that only ever turned up on a neighbour’s feeder two streets away.

8. After the 24 hours have passed

Once the window has closed, your order goes ahead exactly as it was placed. That is not the end of your options. Every Bird Ink piece, personalised or not, can be returned within 60 days of delivery for any reason, and we email you a free return label. You can then order the piece you really wanted, with free shipping again. Our Returns & Exchanges Policy explains each step.

If your message reaches us after the 24 hours have run out, we will still reply within 24 hours on business days and tell you plainly where things stand, so you are not left wondering.

9. Refunds for cancelled orders

When we confirm a cancellation made within 24 hours of ordering, you receive back everything you paid for that order. Refunds are sent within 7 days of our confirming the cancellation, to the payment method you used at checkout, or as store credit if you prefer. Store credit never expires.

If you cancel only one piece from a larger order, the refund covers that piece, sent within the same 7 days. How quickly the money then appears on your statement depends on your bank or payment provider. The full detail is on our Refund Policy page.

10. A checklist before you pay

The easiest change is the one you never need to make. Before you press the button at checkout, take a minute with the product page, which shows your list as it will print:

  • Count your ticked birds against the limit for that piece.
  • Read the yard name aloud, letter by letter. Most typos hide in words we know well.
  • Check the start year. “Since 2019” and “since 2016” look alike at a glance.
  • Read the free line exactly as it will print. What you type is what appears.
  • Look at the size against our Size Guide, and at the colour you picked.
  • Confirm the shipping address, especially for a gift going to someone else’s door.
  • Make sure the email address is right, so the confirmation and tracking details reach you.

11. Ask us

For cancellations and changes, email support@birdink.shop with your order number. Support is by email only, and we reply within 24 hours on business days. You can also read about delivery on Shipping & Delivery, follow an order on Order Tracking or find pre-written subject lines on Submit a Ticket.